What We Do

Services

Every deck job we take on, from a full new build to a railing that's gone wobbly.

Home › Services

Everything we take on

Every job below is one we do ourselves across Winter Haven.

Deck Installation

We frame and build new decks from pressure-treated pine, cedar or composite decking, sized to the loads your family and furniture put on it. Footings go below grade to code depth, and every post sits on poured concrete, not just a paver.

Deck Repair

We replace rotted joists, re-set posts that have shifted, and swap out boards that have gone soft or splintery. Most repairs come down to water getting into a connection that should have been flashed or sealed in the first place.

Deck Staining & Sealing

We pressure wash the deck first to strip old finish and mildew, then let it dry fully before any stain goes on. A good semi-transparent stain and sealer combo has to be redone every two to three years in this climate, sooner on a deck that gets full sun all afternoon.

Custom Deck Design

We lay out multi-level decks, built-in benches and stairs that work with the slope of your yard instead of fighting it. You see a sketch with board direction and railing style before we order a single piece of lumber.

Deck Resurfacing & Board Replacement

If the frame underneath is solid but the decking itself is cupped, gray or splintering, we strip it off and put down new boards on the existing structure. This costs less than a full rebuild and takes a few days instead of a couple of weeks.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot, splinter or need staining, which matters a lot on a deck that sits in Florida sun most of the day. We still frame it to tighter joist spacing than wood decking, because composite sags more between supports if you don't.

Deck Railing Installation & Repair

We build and repair railings to the baluster spacing and height your local code requires, usually 36 inches with gaps under 4 inches. A wobbly rail is almost always a post that was never bolted through the rim joist, and that's the first thing we check.

Deck Demolition & Removal

We tear out old decks, haul off the lumber, and clear the area down to grade for whatever comes next. Sometimes that's a new deck, sometimes it's just a homeowner who wants the eyesore gone.

Screened-In Porch & Deck Combos

We build decks that tie into a screened porch so you get covered and open space off the same back door. Framing has to carry the screen enclosure load too, which changes the post spacing from a standard open deck.

Pergolas & Deck Shade Structures

A pergola or shade structure over part of the deck cuts down the afternoon sun enough to actually use the space in July. We attach it to the deck framing itself, not just toe-nailed to the surface boards.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Winter Haven, FL

We bring the same crew and the same framing standards to every town on this list.

Winter Haven, FL
Lakeland, FL
Kissimmee, FL
Plant City, FL
Haines City, FL
Bartow, FL
Auburndale, FL
Lake Wales, FL
Davenport, FL
Fort Meade, FL
Dundee, FL
Common Questions

Things worth asking

Questions that come up once a project's actually underway.

Do I need a permit to build a deck?
Most decks attached to a house or higher than 30 inches off the ground require a building permit in Florida, including inspection of the footings and framing. Smaller ground-level or freestanding decks sometimes fall under exemptions, but local building departments should confirm this before work starts.
How long does it take to build a deck?
A standard single-level deck typically takes one to two weeks from framing to final boards, depending on size and weather. Multi-level decks, built-in railings or a screened porch combo add extra days for framing and inspection.
Can a deck be built to a specific budget?
Deck size, decking material and railing style can all be adjusted to fit a target budget, with pressure-treated pine as the lowest-cost decking option and composite or cedar costing more. A written quote should break down material and labor so the areas where cost can flex are clear.
Is there a guarantee on deck construction or repair work?
Workmanship guarantees on deck construction typically cover framing and structural work for a set period after completion, separate from manufacturer warranties on composite decking or hardware. Any guarantee terms should be written into the contract, not just stated verbally.
Who will I be dealing with during the project?
On most deck jobs, a single point of contact, usually the crew lead or owner, handles scheduling, material questions and any changes during construction. This avoids the back-and-forth of dealing with a different person every time a question comes up.
What decking materials do you work with?
Common decking materials include pressure-treated southern yellow pine, cedar, and composite brands like Trex and TimberTech. Pine costs less upfront but has to be restained every two to three years, while composite costs more initially but requires almost no upkeep beyond washing.
Can I still use my yard and house while the deck is being built?
Most of the house stays fully usable during deck construction, since the work is contained to the deck footprint and immediate yard area. Access to the yard near the build site is usually limited for safety while framing and footings are underway.
How should I prepare my yard before deck construction starts?
Clearing furniture, grills and potted plants from the existing deck or build area lets the crew start without delay on day one. Marking the location of sprinkler lines or underground utilities in the yard also helps avoid damage during footing excavation.
What happens if you find rot or a problem once work has started?
If hidden rot, termite damage or a failing ledger board connection turns up once old decking is removed, the issue gets flagged with photos and a cost estimate before any extra work begins. This is common on repair and resurfacing jobs where the condition of the frame isn't visible until the old boards come off.
How do I maintain a deck after it's finished?
Wood decks require re-staining roughly every two to three years in Florida's sun, plus a yearly check for loose fasteners or soft boards. Composite decking just requires periodic washing to clear pollen and mildew, with an occasional check of railing connections and fasteners.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (863) 334-3921